Concreting of the first panel of the supporting wall of the disposal silo

 

After the successful installation of the first cage installation for the first primary panel of the silo outer wall we have already carried out the first concreting. More than 700 m3 of concrete was installed in the first panel.

Scroll to Top
Skip to content