Construction works on future LILW disposal facility

 

At the construction site of LILW disposal facility, we started construction for the implementation of the support wall of the disposal silo (diaphragm). The entrance is designed as a reinforced concrete wall, which represents base for the excavation machine of the supporting wall of the disposal silo and a temporary construction. The area is also prepared for the contractor to install the retaining wall of the disposal silo. 

Scroll to Top
Skip to content